Upgrade Central Heat Plant, Malmstrom AFB
Project Description: GPD, PC provided Project Management, Mechanical and Electrical services to design a more efficient natural gas burner upgrade for Malmstrom AFBs Centralized Heat Plant. The project utilizes a new single, ultra-low NOx retrofit burner unit to minimize impacts to the existing boiler walls, and provides an increased capability to operate at variable capacities as well as more efficiently at lower heat demands from the Base. Also included with this work were upgrades to the industrial control systems, upgrades to the induced and forced draft industrial fans, reconstruction of the existing distribution system valves, a new industrial cooling loop system for the High-Temperature Hot Water distribution system pumps, and electrical upgrades to support these new systems.