ENGINEERING∙DESIGN∙MANAGEMENT

Copyright � 2015 GPD PC

Design and Construction Administration of approximately 105,000 sq. ft. of new Patient Tower, Radiology Department, Emergency Department, Ambulance Garage, Chiller Plant, and Emergency Power Plant. Remodeled areas included approximately 40,000 sq. ft. of ICU, Pharmacy, Medical Records, Same-Day-Surgery, and other miscellaneous spaces.

Saint Peters Hospital - Facility Expansion, Helena, Montana

Design and Construction Administration of a 2,350 sq. ft. neonatal research laboratory that was a joint venture between the University of Montana and St. Patrick Hospital. The facility houses tissue analysis areas, an open laboratory with fume hoods, tissue storage with 20°C and -80°C freezers and office space.

Text Box: Saint Patrick Hospital - Neonatal Research laboratory, Missoula, Montana

Electrical and Mechanical design for the remodel of 3 existing operating rooms and the addition of 4 new operating rooms. The new operating rooms incorporated the latest technology in laminar flow HVAC. The project also included the layout and design of new Level I and Level II recovery rooms, sterile core and clean and dirty decontamination rooms.

Community Medical Center - OR Remodel & Addition, Missoula, Montana

MEP Design and construction administration for an 8,160 sq. ft. ambulatory surgery center outpatient addition to an existing 20,000 sq. ft. sports medicine clinic. The A.S.C. addition contains two operating rooms, one O.R. procedure swing room, an MRI, 4-bed recovery area, 4-bed pre-op and 4-bed step down lounge, a nurses station, a reception/business office area, emergency generator, staff locker and toilet rooms.

Flathead Valley Orthopedic & Sports Medicine - Ambulatory Surgery Addition, Kalispell, Montana

The Bioscience Facility is a 40,000 sq. ft. office/research facility located at Montana State University. The facility consists of a three-story research wing set up with specialized research laboratories and shelled space laboratories that can be fitted at a future date. All ventilation systems in the research wing are once through systems. A three-story office wing is connected to the research wing. The piping systems in the building are for natural gas, compressed air, vacuum and reverse osmosis water. The project also included a Bio-Safety level 3 Greenhouse and 20,000 sq. ft. greenhouse expansion.

MSU - Agricultural Bioscience Facility, Bozeman, Montana

Project consisted of remodeling an existing 4,000 sq. ft. animal holding facility into a new Bio-Safety level 3 Small Animal Facility with cage washing facilities, containment animal holding rooms, BSL-3 research laboratory, and 6,000 sq. ft. of large animal BSL-2 holding spaces for animal research .

MSU - Small Animal Facility/Large Animal Facility, Bozeman, Montana

Text Box: More details...

Project consisted of a 55,000 sq. ft. 4-story building addition with mechanical penthouse. Spaces included 25,000 sq. ft. of new research laboratory spaces, office spaces, small animal holding facility, cage washing equipment and office spaces. The building required new primary electrical extension and emergency generator.

University of Montana - Chemistry (Skaggs) Building Addition, Missoula, Montana

Text Box: More details...